Battery and automotive components
- Portfolio
- 45 MW across 9 plants · about 305 GWh
- MEP scope
- Supply tender
- Baseline
- Bills and interval data
Enter monthly consumption and your bill, tell us which systems run in your plant, and see a savings range by measure. The range is priced at your own rate and uses published measure ranges where they exist.
It takes about two minutes. The result is a screening and is labeled illustrative.
The range updates as you answer. Leave a question on Not sure if you do not know.
Your monthly bill divided by your monthly kWh gives the rate that prices every saving, so the screening needs no tariff tables. Your sector sets a planning split of consumption across lighting, HVAC, compressed air, motors and other loads.
Each answer switches measures on or off, and a Not sure answer counts at half. Measures on the same system combine without double counting and are capped per system. The total is capped at 35% of annual spend. A power factor surcharge you enter is CFE's exact figure and is never scaled down. Purchasing savings appear on a separate line.
Leak repair, pressure reduction, lighting controls and motor drives use ranges inside published DOE, NRCan and LBNL figures. The other ranges and the load splits are MEP planning assumptions, and the report says so.
Sources: US DOE Compressed Air Tip Sheet 3 and Motor Systems Tip Sheet 13, Natural Resources Canada compressed air guidance, LBNL meta analysis of lighting controls (2011). Grid emission factor: FESEN 2024, 0.444 tCO2e/MWh, the factor SEMARNAT confirmed for 2026 reporting.
The screening uses planning assumptions. The assessment and the audit replace them with your plant’s data.
Each figure states whether it was achieved or only identified. Client names are shared under a confidentiality agreement.
Results vary by facility. Identified figures are estimates subject to verification and are not verified or guaranteed savings. MEP calls a saving verified only with measurement and verification under IPMVP.
May receive referral payments or commissions from the winning supplier or an equipment brand.
Represents only the client and receives no commissions or referral payments from any party to the transaction. Executive and technical support in Spanish and English, with one point of contact for energy purchasing, regulation and settlements.
MEP wrote Buying Power in Mexico, a 409 page handbook for industrial buyers on electricity procurement, PPAs and the wholesale market, published in August 2026. Mexico Energy Insights, MEP’s research blog, is read by about 20,000 people a month.
Adidas, Axalta, Bayer, Clarios, ITP Aero, Metalor, Morgan Advanced Materials and Quick Learning, among others. Confidential assignments remain unnamed.
No. It is an illustrative screening. MEP calls a saving verified only with measurement and verification under IPMVP.
Buying on the wholesale market under qualified supply lowers the price of energy, not the kWh you use. Mixing it into the efficiency total would overstate both.
One recent CFE bill per plant or twelve months of monthly consumption, the plant location and the type of operation. No site visit at that stage.
The full report opens on screen as soon as you submit the form, with the measures ranked by value and the data each one needs. A partner of MEP writes within one business day and, where it makes sense, proposes a preliminary assessment based on your own bills.