What punta hours cost your plant on GDMTH

On GDMTH, the demand your plant draws in punta sets the capacity charge. In CONUEE's published example bill it is 36% of the total. Type the figures from one CFE bill and see the cost per kW and per year, calculated the way CFE bills it.

Every input is printed on a GDMTH bill. The calculator stores no rates.

1,150+MW migrated to renewable energy
25.4%weighted average savings from renewable energy procurement, 2020 to 2025
2015operating as an independent advisor in Mexico
18technical and advisory professionals

Your peak hour exposure

Example figures load first. Replace them with the figures on your bill.

How the figure is calculated

On GDMTH, CFE bills capacity on the lower of two figures: the demand your plant draws in punta, and a demand derived from your monthly energy with a load factor of 0.57. The calculator applies that rule to your bill and divides the capacity charge by the kW billed to give your own price per kW.

When the derived figure is the lower one, capacity is billed on it, and cutting demand in punta saves nothing until it falls below that level. The report says which case applies. Punta energy comes straight from the punta line on your bill.

On the national grid, punta runs two hours on summer weekdays, four on winter weekdays and two on winter Saturdays. Baja California and Baja California Sur have their own hours and no punta period in winter.

Derived demand = kWh ÷ (24 × days × 0.57)
Capacity billed on the lower of kW punta and derived demand
Your capacity price = capacity charge ÷ kW billed

Sources: CNE Acuerdo CT/11.SE/8-2025, tariff methodology for basic supply in 2026 (tables 1, 2, 4 and 5, section 5.1.1). CONUEE, guide to the GDMTH bill.

What MEP’s demand and tariff review delivers

One bill shows one month. The review covers twelve, and the loads behind the peak.

What we work from

  • Twelve months of GDMTH bills
  • Fifteen minute demand data from the CFE meter, where available
  • Production schedules for the lines that run in punta hours

What you receive

  • The months in which demand in punta set the capacity charge
  • The loads that set the monthly peak and what each one costs
  • A comparison with qualified supply where the plant qualifies
  • A recommended route with the figures behind it
CEMCertified Energy Manager
CMVPCertified Measurement and Verification Professional
ISO 50001Lead auditor
ASHRAE 211Energy audit methodology
IPMVPMeasurement and verification

Two ways to lower what punta costs

Which one fits depends on whether demand in punta sets your capacity charge and on how much load you can move.

Demand management in punta hours

Moving flexible loads and staggering line starts lowers the capacity charge when demand in punta sets it. The next bill shows the effect under the same rule.

Get the full report

Qualified supply in the MEM

Plants that qualify can replace the GDMTH tariff with a negotiated supply contract and competitive offers. MEP confirms eligibility in a readiness review.

MEM readiness review

Results at manufacturers with several sites

Each figure states whether it was achieved or only identified. Client names are shared under a confidentiality agreement.

18%Achieved

Battery and automotive components

Portfolio
45 MW across 9 plants · about 305 GWh
MEP scope
Supply tender
Baseline
Bills and interval data
28.5%IRR identified

Automotive stamping, El Bajío

MEP scope
Plant energy audit
Economic value
About USD 487,000
Emissions
About 1,140 tCO2e a year, near 23% of Scope 2 emissions (GHG Protocol, market based method)
15%Identified

Multisite industrial

Portfolio
6 MW across 3 sites · about 32 GWh
MEP scope
Savings estimate
Baseline
Billing and site data

Results vary by facility. Identified figures are estimates subject to verification and are not verified or guaranteed savings. MEP calls a saving verified only with measurement and verification under IPMVP.

MEP is paid only by the client

0commercial relationships with equipment vendors
0commissions from suppliers or generators
100%of fees paid by the client
Typical integrator

May receive referral payments or commissions from the winning supplier or an equipment brand.

Mexico Energy Partners

Represents only the client and receives no commissions or referral payments from any party to the transaction. Executive and technical support in Spanish and English, with one point of contact for energy purchasing, regulation and settlements.

Who stands behind the numbers

Research

MEP wrote Buying Power in Mexico, a 409 page handbook for industrial buyers on electricity procurement, PPAs and the wholesale market, published in August 2026. Mexico Energy Insights, MEP’s research blog, is read by about 20,000 people a month.

Clients

Adidas, Axalta, Bayer, Clarios, ITP Aero, Metalor, Morgan Advanced Materials and Quick Learning, among others. Confidential assignments remain unnamed.

Common questions

Where do I find these figures?

On the first page of a GDMTH bill: the consumption and demand table, and the Costos de la energía en el MEM table.

My bill shows no punta kWh

Baja California and Baja California Sur have no punta period in winter. If you buy on qualified supply, your bill comes from your supplier and this calculator does not apply.

Does this apply on qualified supply?

No. Qualified supply replaces the GDMTH tariff with a supply contract. MEP's MEM readiness review covers that comparison.

After you submit the form

The full report opens on screen as soon as you submit the form. A partner of MEP writes within one business day to go over what your bill shows and whether demand management, qualified supply or both fit your plant.