Esta página también está disponible en español. Ver en español

What power interruptions cost your plant each year

Most plants know their electricity bill to the peso but not the cost of the hours lost to outages and voltage sags. Four figures your operations team already has give you the annual number.

No bill needed. Nothing is sent to MEP until you ask for the full report.

1,150+MW migrated to renewable energy
25.4%weighted average savings from renewable energy procurement, 2020 to 2025
2015operating as an independent advisor in Mexico
18technical and advisory professionals

Your annual cost of interruptions

Enter your own figures. The result updates as you type, and the full report opens after a short form.

How the figure is calculated

The calculator multiplies the margin you lose for each hour of stopped production by the hours each event costs, adds the scrap from one event, and multiplies by the number of events in a year. It uses only the four figures you enter.

Use contribution margin, not revenue. During a stop the plant does not consume materials, so revenue overstates the loss. If lost output is made up later with overtime, the overtime cost is the better figure.

Count every event that stops a line, including voltage sags that trip drives, and measure downtime until lines run at rate again. The figure leaves out equipment damage, missed shipments and customer penalties.

Cost per event = margin lost per hour × hours per event + scrap per event
Annual cost = events per year × cost per event

What MEP’s power quality assessment delivers

The calculator prices the exposure from your own estimates. The assessment replaces them with measured data.

What we work from

  • Thirty days of power quality measurement at the service entrance and on critical loads
  • Your downtime and event records for the same period
  • Margin and scrap figures by line from finance and operations
  • The single line diagram of the plant

What you receive

  • Every recorded event matched to its production cost
  • Which events your critical equipment rides through and which stop it
  • Mitigation options priced and ranked, from equipment settings and UPS to battery storage
  • A decision memo with the figures finance needs to approve or reject
CEMCertified Energy Manager
CMVPCertified Measurement and Verification Professional
ISO 50001Lead auditor
ASHRAE 211Energy audit methodology
IPMVPMeasurement and verification

MEP is paid only by the client

0commercial relationships with equipment vendors
0commissions from suppliers or generators
100%of fees paid by the client
Typical integrator

May receive referral payments or commissions from the winning supplier or an equipment brand.

Mexico Energy Partners

Represents only the client and receives no commissions or referral payments from any party to the transaction. Executive and technical support in Spanish and English, with one point of contact for energy purchasing, regulation and settlements.

Who stands behind the numbers

Research

MEP wrote Buying Power in Mexico, a 409 page handbook for industrial buyers on electricity procurement, PPAs and the wholesale market, published in August 2026. Mexico Energy Insights, MEP’s research blog, is read by about 20,000 people a month.

Clients

Adidas, Axalta, Bayer, Clarios, ITP Aero, Metalor, Morgan Advanced Materials and Quick Learning, among others. Confidential assignments remain unnamed.

Common questions

What happens with the figures I enter?

The calculation runs in your browser. Nothing is sent to MEP unless you request the full report with the form.

Is this an engineering estimate?

No. It is a directional estimate from your own figures. An engineering estimate needs measured data from your plant.

What does the full assessment involve?

Thirty days of power quality measurement at your plant, each recorded event matched to its cost, and the mitigation options priced so finance can compare them with the exposure.

After you submit the form

The full report opens on screen as soon as you submit the form. A partner of MEP writes within one business day to go over it and, if the figures justify a closer look, proposes a power quality assessment with fee and timeline.

Calculate your cost
Use the calculator